皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页体育正文

皇冠线上开户(www.hg108.vip):Fukushima debris removal delayed by another year

admin2022-08-286

新2手机网址www.99cx.vip)实时更新发布最新最快的新2手机网址、新2手机网址线路、新2手机网址登录网址、新2手机网址管理端、新2手机网址手机版登录网址、新2手机皇冠登录网址。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

皇冠线上开户www.hg108.vip)是一个开放皇冠正网即时比分、皇冠线上开户的平台。皇冠线上开户平台(www.hg108.vip)提供最新皇冠登录,皇冠APP下载包含新皇冠体育代理、会员APP。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

网友评论

热门标签